Difference between revisions of "RAL Tier1 weekly operations castor 20/05/2016"
(Created page with " == Operation news == Automated workflow for disk server deployment has been disabled New CASTOR functional testing using xrootd will be enabled on Monday 23/5/2016 == CASTO...") |
(→CASTOR issues) |
||
Line 18: | Line 18: | ||
rebuilding | rebuilding | ||
− | GDSS727 (production D1T0 CMS disk server)FSProbe Error | + | GDSS727 (production D1T0 CMS disk server) FSProbe Error |
− | It has been removed from Production and Overwatch Updated (Gareth) | + | It has been removed from Production and Overwatch Updated (Gareth, [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=172141]) |
Ongoing work on the upgrade to CASTOR 2.1.15 on preprod | Ongoing work on the upgrade to CASTOR 2.1.15 on preprod |
Revision as of 10:30, 20 May 2016
Operation news
Automated workflow for disk server deployment has been disabled New CASTOR functional testing using xrootd will be enabled on Monday 23/5/2016
CASTOR issues
Heavy wokload on the Atlas scracth disk resulting in almost nothing being achieved
Full recover from the tape robot and air condition problems
Double put start on CASTOR facilities
Some work to be done on the imrovement of the logic of the new draining script
gdss664 was brought back to production on 18/05/2016 at ca. 15:00 folowing a sucessfull rebuilding
GDSS727 (production D1T0 CMS disk server) FSProbe Error It has been removed from Production and Overwatch Updated (Gareth, [1])
Ongoing work on the upgrade to CASTOR 2.1.15 on preprod
GP to talk to Andrew Lahif about a SL7 upgrade on the worker nodes
SRM DB duplicates removal script is under testing
Will test the newly created taple families for ATLAS