4.4
1 4.4.1 UK testbed is established DUE 01-May-02
Description Initial UK testbed established usable by GridPP V0 Members.
 
 
Metric At least 5 members, a UK resource broker, and information hierarchy, and V0 server.
Simple jobs should run
Risk and/or      
Dependency      
Status Complete Status Date 05-Jun-02 Modified Due Date   J Link to Andy McNabs GridPP6 talk summary slide
2 4.4.2 BaBar simulation or analysis demonstration DUE 01-Oct-02
Description BaBar simulation or analysis demonstration on the UK testbed
 
 
Metric Successful submission and completion of BaBar jobs
 
Risk and/or      
Dependency      
Status Complete Status Date 05-Jun-02 Modified Due Date   J
3 4.4.3 Core-sites part of EDG testbed DUE 01-Oct-02
Description The UK testbed core-sites (i.e. with WP6 posts: RAL, ICSTM, Manchester, Bristol) should by this
time be part of the EDG testbed
 
Metric RAL, ICSTM, Manchester, and Bristol members of the EDG testbed.
 
Risk and/or      
Dependency      
Status Complete Status Date 01-Oct-02 Modified Due Date   J Link to Andy McNabs GridPP6 talk summary slide
See Text->
4 4.4.4 GridPP Hetrogeneous Testbed demonstration DUE 01-Apr-03 Hetrogenous Testbed demonstration?
Description Demonstration that the UK testbed has grown to include a mixture of resources. LHCb can do this (? NB) 12/3/3
  JetWeb and Guido? (JG) 12/3/3
 
Metric Demonstration of simple application running across heterogeneous resources such as EDG testbed  Loads of machines in different parts of the county and a simple
and dedicated BaBar resources (one off demonstration). job can run on many of them 
Risk and/or       JG: One off test showing no fundemental problem (GridPP VO plus resource broker should be sufficient)
Dependency       JG to assign task to one of the new people
Status Complete Status Date   Modified Due Date   J
5 4.4.5 Tier-2 Centre Integration DUE 01-Oct-03
Description By this time at least one Tier-2 centre should be part of the UK testbed
 
 
Metric Tier-2 centre is part of testbed
 
Risk and/or      
Dependency      
Status Complete Status Date 08-Dec-03 Modified Due Date   J IC and Cambridge are part of LCG testbed and were previously in EDG application testbed
6 4.4.6 LCG Testbed DUE 31-Dec-03
Description The UK will be part of the LCG approved test-bed
 
 
Metric UK is recognised by LCG as a member of test-bed
 
Risk and/or LCG testbed not developed    
Dependency      
Status Complete Status Date   Modified Due Date   J