J 6.2 Interoperability   Status Date 01-Apr-08     90 days
Owner: Neil Geddes
Number Title Due Status Links More…
1 6.2.1 Common GridPP/NGS helpdesk and problem tracking infrastructure 01-Oct-06 Complete I  
I
Metric  Publically available helpdesk and problem tracking infrastructure exists            
Risk/Dep   [1]                  
History  ChangeForm1[2] Email from  JG 20/6/05                
2 6.2.2          
I Email from NG 2/2/6
Metric  Document specifying agreed GridPP/NGS plans        
Risk/Dep   [3]                  
History  ChangeForm1 ChangeForm2                
3 6.2.3 First jointly supported service 01-Jun-05 Complete    
I Email from NG 2/2/6: RB at RAL and VOMS at Manchester
Metric  At least one service supported across NGS and GridPP            
Risk/Dep                     
History                     
4 6.2.4 Common security policy 01-Jan-05 Complete I I
I
Metric  Joint GridPP/NGS document specifying security-incident procedures in the UK   I I    
Risk/Dep                     
History                     
5 6.2.5 Integrated plan for Grid support in the UK beyond 2007  01-Apr-06 Failed    
I Was constrained by the funding mechanisms (NGS responded to call from JCSR and GridPP to PPARC - recognises that time was not yet right)
Metric  Ensure that document is, or will be, produced by appropriate body            
Risk/Dep                     
History                     
6 6.2.6 First stage connection of GridPP sites to NGS 01-Apr-05 Complete    
I Glasgow and IC have enabled NGS VO
Metric  One site per Tier-2 connected to NGS and monitored through NGS SLD mechanism            
Risk/Dep                     
History                     
7 6.2.7 Second stage connection of GridPP sites to NGS 01-Sep-07 Failed    
I Email from NG 2/2/6: Plan to redefine these 3 milestones after Feb06 OC
Metric  50% of institutes are NGS affiliates            
Risk/Dep                     
History  ChangeForm1                  
8 6.2.8          
I Email from NG 2/2/6: Plan to redefine these 3 milestones after Feb06 OC
Metric  90% of institutes connected to NGS and monitored through NGS SLD mechanism            
Risk/Dep                     
History  ChangeForm1                  
9 6.2.9 Number of NGS representatives on GridPP committees On going OK    
I
Metric  Number of NGS representatives on GridPP committees 1 2        
Risk/Dep                     
History                     
10 6.2.10 GridPP attendance at NGS committee meetings On going OK    
I
Metric  Number of attendences / Number of invitations 75% 75%        
Invitations 4                
Attendences 3                
11 6.2.11 Number of Non-HEP applications tested on GridPP Grid On going OK    
I
Metric  Submission via NGS submission mechanism to GridPP resources 3 1        
Risk/Dep                     
History  15-Jun-05[4] BIOMED                
12 6.2.12 Number of GridPP members attending GGF meetings On going OK I  
I
Metric  Five per meeting 42 65        
Risk/Dep                     
History                     
13 6.2.13 Number of GridPP members in charge of formal GGF Working Groups On going OK I  
I
Metric  One or more 1 4      
Risk/Dep                     
History                     
14 6.2.14 Implemented Common Security Policy 01-Nov-05 Complete    
I
Metric  Common security policy (6.2.4) is put in place and adopted.            
Risk/Dep                     
History  Email from NG 21/6/05                  
15 6.2.15          
 
I
Metric           
Risk/Dep                 
History                 
01-Oct-06 01-Oct-04
00-Jan-00 01-Jan-05
01-Jan-05 01-Apr-05
01-Apr-06 01-Jul-05
01-Apr-05 01-Oct-05
01-Sep-07 01-Jan-06
00-Jan-00 01-Apr-06
On going 01-Jul-06
01-Oct-06
01-Jan-07
01-Apr-07
01-Jul-07

[1]
Fill this in with code from Risk Register or use comments to note particular risks or dependencies
[2]
Links to ChangeForms if necessary
[3]
Britton:
Depends on EGEE timeline
[4]
David Britton:
Currently trivial as “NGS submission” mechanism is simple globus_job_submit. No standing tests of this are carried out. Metric is not currently achieved in the spirit intended.