J
4.2
SamGrid
Status Date
01-Apr-08
90
days
Owner:
Gavin Davies
Number
Title
Due
Status
Links
More…
1
4.2.1
Planning Documents
15-Sep-05
Complete
I
I
Metric
Runjob interfaces document; Required features and interfaces document.
Risk/Dep
[1]
History
ChangeForm1
[2]
2
4.2.2
Runjob adaptor code for CDF
Deleted
I
Metric
Software release
Risk/Dep
History
ChangeForm1
[3]
3
4.2.3
Generic runjob release (integrated version)
01-Apr-06
Complete
I
Metric
Demonstrate implementation of Production applications on SAM-Grid
Risk/Dep
History
ChangeForm1
[4]
ChangeForm1
[5]
4
4.2.4
Definition of,and implementation of code for, list of Grid Atchitectures towhich D0runjob is to be interfaced.
01-Jul-07
Complete
I
I
Metric
Code released. (see level-2 deliverables in Elog; Milestone does not include 4.2.4.5).
Risk/Dep
History
ChangeForm1
[6]
5
4.2.5
I
Metric
Risk/Dep
History
ChangeForm1
[7]
6
4.2.6
Extension of Monte Carlo Request System
01-Jul-07
Complete
I
I
This is called 4.2.5 in the eLog
Metric
Software release; see Elog 4.2.6.1 to 4.2.6.4.
Risk/Dep
History
ChangeForm1
[8]
7
4.2.7
Dzero user analysis
01-Jan-08
In Progress
I
Metric
Prototype user analysis system; see Elog 4.2.7.1 to 4.2.7.4
This was not completed by the last Q report
Risk/Dep
History
ChangeForm1
[9]
8
4.2.8
Maintain environment for running CDF + D0 products on GridPP sites.
On going
OK
I
Metric
Greater than 90% of target sites are available.
1
OK
Risk/Dep
History
See Email from RJ 19
/6/05
9
4.2.9
Performance Monitoring
On going
OK
I
Metric
Monitor the performance of the RAC. Results and future targets updated in logbook.
1
OK
Risk/Dep
History
See 05Q4 logbook
10
4.2.10
LCG compatible submission system Review and Planning Document
01-Apr-05
Complete
I
I
I
Metric
Document
Risk/Dep
History
11
4.2.11
Production Release of SAM-Grid service for data-processing
01-Jan-06
Complete
I
I
Metric
Software release
Risk/Dep
History
ChangeForm1
12
4.2.12
Prototype release of workload management system
01-Jan-07
Complete
I
I
Metric
Software release. Works with pproved list of Grid Architectures
Risk/Dep
History
13
4.2.13
Production release of workload management system
01-Jul-07
In Progress
I
In progress (see elog)
Metric
Software release: Production level interoperability between Sam-Grid and LCG WLMS
Risk/Dep
History
14
4.2.14
Final release of workload management system
31-Aug-07
In Progress
I
In progress (see elog)
Metric
Software release: Interoperability between SAM-Grid and
other pre-identified grids
Risk/Dep
History
15
4.2.15
User Interface for RunJob (was 4.2.3b)
15-Sep-06
Complete
I
I
I
Metric
Release of Runjob version that supports user executables.
Risk/Dep
History
Creation Form
[10]
[1]
Fill this in with code from Risk Register or use comments to note particular risks or dependencies
[2]
Links to ChangeForms if necessary
[3]
Links to ChangeForms if necessary
[4]
Links to ChangeForms if necessary
[5]
Links to ChangeForms if necessary
[6]
Links to ChangeForms if necessary
[7]
Links to ChangeForms if necessary
[8]
Links to ChangeForms if necessary
[9]
Links to ChangeForms if necessary
[10]
Links to ChangeForms if necessary