J 4.2 SamGrid     Status Date 01-Apr-08     90 days
Owner: Gavin Davies
Number Title Due Status Links More…
1 4.2.1 Planning Documents 15-Sep-05 Complete I  
I
Metric  Runjob interfaces document; Required features and interfaces document.            
Risk/Dep   [1]                  
History  ChangeForm1[2]                  
2 4.2.2 Runjob adaptor code for CDF   Deleted    
I
Metric  Software release          
Risk/Dep                     
History  ChangeForm1[3]                  
3 4.2.3 Generic runjob release (integrated version) 01-Apr-06 Complete    
I
Metric  Demonstrate implementation of Production applications on SAM-Grid            
Risk/Dep                     
History  ChangeForm1[4] ChangeForm1[5]                
4 4.2.4 Definition of,and implementation of code for, list of Grid Atchitectures towhich D0runjob is to be interfaced. 01-Jul-07 Complete I  
I
Metric  Code released. (see level-2 deliverables in Elog; Milestone does not include 4.2.4.5).          
Risk/Dep                     
History  ChangeForm1[6]                  
5 4.2.5          
I
Metric               
Risk/Dep                     
History  ChangeForm1[7]                  
6 4.2.6 Extension of Monte Carlo Request System 01-Jul-07 Complete I  
I This is called 4.2.5 in the eLog
Metric  Software release; see Elog 4.2.6.1 to 4.2.6.4.            
Risk/Dep                     
History  ChangeForm1[8]                  
7 4.2.7 Dzero user analysis 01-Jan-08 In Progress    
I
Metric  Prototype user analysis system; see Elog 4.2.7.1 to 4.2.7.4             This was not completed by the last Q report
Risk/Dep                     
History  ChangeForm1[9]                  
8 4.2.8 Maintain environment for running CDF + D0 products on GridPP sites.  On going OK    
I
Metric  Greater than 90% of target sites are available. 1 OK        
Risk/Dep                     
History  See Email from RJ 19/6/05                  
9 4.2.9 Performance Monitoring On going OK    
I
Metric  Monitor the performance of the RAC. Results and future targets updated in logbook. 1 OK        
Risk/Dep                     
History  See 05Q4 logbook                  
10 4.2.10 LCG compatible submission system Review and Planning Document 01-Apr-05 Complete I I
I
Metric  Document            
Risk/Dep                     
History                     
11 4.2.11 Production Release of SAM-Grid service for data-processing 01-Jan-06 Complete I  
I
Metric  Software release            
Risk/Dep                     
History  ChangeForm1                  
12 4.2.12 Prototype release of workload management system 01-Jan-07 Complete I  
I
Metric  Software release. Works with pproved list of Grid Architectures            
Risk/Dep                     
History                     
13 4.2.13 Production release of workload management system 01-Jul-07 In Progress    
I In progress (see elog)
Metric  Software release: Production level interoperability between Sam-Grid and LCG WLMS            
Risk/Dep                     
History                     
14 4.2.14 Final release of workload management system 31-Aug-07 In Progress    
I In progress (see elog)
Metric  Software release: Interoperability between SAM-Grid and  other pre-identified grids            
Risk/Dep                     
History                     
15 4.2.15 User Interface for RunJob (was 4.2.3b) 15-Sep-06 Complete I I
I
Metric  Release of Runjob version that supports user executables.            
Risk/Dep                     
History  Creation Form[10]                  

[1]
Fill this in with code from Risk Register or use comments to note particular risks or dependencies
[2]
Links to ChangeForms if necessary
[3]
Links to ChangeForms if necessary
[4]
Links to ChangeForms if necessary
[5]
Links to ChangeForms if necessary
[6]
Links to ChangeForms if necessary
[7]
Links to ChangeForms if necessary
[8]
Links to ChangeForms if necessary
[9]
Links to ChangeForms if necessary
[10]
Links to ChangeForms if necessary