J
4.1
BaBar
Status Date
01-Apr-08
90
days
Owner:
Fergus Wilson
Number
Title
Due Date
Status
Links
More…
1
4.1.1
A1: Assessment of BaBar requirements for data analysis over the next 3 years
01-Jan-05
Complete
I
I
Metric
Assessment Document
Risk/Dep
[1]
History
[2]
2
4.1.2
A2:
Data analysis using a BaBar physics topic using currently available GRID infrastructure.
01-Jul-05
Complete
I
I
Metric
Analysis pf 100 fb-1
Risk/Dep
[3]
History
[4]
3
4.1.3
A3: Distributed analysis possible at all participating BaBar Tier 1 and 2 sites.
01-Jan-06
Complete
I
I
Metric
Successful distribution of analysis of 200 fb-1 among BaBar UK Tier 2.
Risk/Dep
History
4
4.1.4
A4: Transition to full LCG infrastructure for analysis at all participating BaBar UK sites
01-Jul-06
Complete
I
But Manchester is only participating UK site
Metric
Ability to complete analysis at non-BaBar UK site
Risk/Dep
History
5
4.1.5
Design and code new Task Manger software to enable BaBAr skimming on the Grid"
01-Sep-07
Complete
I
Metric
Multiple users performing multiple analyses at multiple sites
Risk/Dep
History
ChangeForm1
6
4.1.6
"Run large scale skim production at Manchester Tier 2"
14-May-07
Complete
I
Ran 37,703 jobs in 6 months with 93.6% effiency (email Bailey via Barlow 1/10/07)
Metric
One month of continuous skimming using at least 200 machines with 90% efficiency and maximum 48 hour latency
Risk/Dep
History
ChangeForm1
7
4.1.7
B1: Official BaBar production of simulated events using core LCG components on 2 or more BaBar UK Tier 2 sites.
01-Jul-05
Complete
I
I
I
Metric
2 million events per week per 100 cpus.
Risk/Dep
History
8
4.1.8
B2: Official BaBar production of simulated events using core LCG components on all participating BaBar UK Tier 2 sites and testing on non-BaBar UK Tier 2 site
01-Jan-06
Complete
I
I
Metric
1 million events per week per site.
Risk/Dep
History
9
4.1.9
B3: Official BaBar production of simulated events using enhanced LCG at one or more non-BaBar UK Tier 2 site
In Progress
I
According to 07Q3 this is substantially complete
Metric
1 million events per week at non-BaBar UK Tier 2.
Risk/Dep
History
ChangeForm1
10
4.1.10
B4: Official BaBar production of simulated events using all LCG features at all accessible UK GRID resources.
In Progress
I
According to 07Q3 this is substantially complete
Metric
Efficient production (90%) with numbers dependent on resources
Risk/Dep
History
ChangeForm1
11
4.1.11
B5: Official BaBar production of simulated events at all available European and some US GRID sites
Not Started
I
According to 07Q3 this is substantially complete
Metric
Take up of production by sites aiming for 1 million events per week per 25 cpus.
Risk/Dep
History
ChangeForm1
12
4.1.12
B6: Production at all available US GRID sites using LCG or non-LCG GRID software
Not Started
I
According to 07Q3 this is substantially complete
Metric
Uptake of production by all contributing US sites at for 1 million events per week per 25 cpus.
Risk/Dep
History
ChangeForm1
13
4.1.13
I
Metric
Risk/Dep
History
14
4.1.14
I
Metric
Risk/Dep
History
15
4.1.15
I
Metric
Risk/Dep
History
Link to Deliverable A1.1
Link to Something
[1]
Fill this in with code from Risk Register or use comments to note particular risks or dependencies
[2]
Links to ChangeForms if necessary
[3]
Fill this in with code from Risk Register or use comments to note particular risks or dependencies
[4]