http://people.brunel.ac.uk/~eestprh/GRIDPP/Logbook/
J 3.4 CMS     Status Date 01-Apr-08     90 days
Owner: Peter Hobson
Number Title Due Date Status Links More…
1 3.4.1 (III-a) BOSS/RGMA performance analysis study. 01-Apr-05 Complete I  
I
Metric  Document (performance analysis using at least 5 simultaneous LCG resources)            
Risk/Dep   [1]                  
History   [2]                  
2 3.4.2 (III-b) Metadata requirements analysis 01-Jul-05 Complete I  
I 4.4.1, 4.5 and 4.7.1.4 were contributed
Metric  Document: Section in CMS computing TDR.        
Risk/Dep   [3]                  
History   [4]                  
3 3.4.3 (III-c) Production Metadata delivery system   Retired    
I
Metric  Software release.        
Risk/Dep                     
History  ChangeForm1                  
4 3.4.4 (IV-a,b,c) CMS Data Challenges and Deployment On going OK    
I
Metric  System deployment; production and replication of data sets. See logbook IV(a)(b)(c).        
Risk/Dep                     
History  First due 1/Oct/05                  
5 3.4.5 (II-a) Local and wide-area data management study 01-Jul-05 Complete I  
I
Metric  Document: Section in CMS computing TDR.            
Risk/Dep                     
History                     
6 3.4.6 (II-b) Deployment of high-speed bulk data replication services 28-Feb-07 Complete I I
I Tim Barrass departure has delayed.
Metric  System deployed and achieves essentially the TDR specification            
Risk/Dep                     
History  ChangeForm1                  
7 3.4.7 (II-c) Data distributions system for Monte Carlo data. 01-Jul-06 Complete    
I
Metric  Software release. Data was successfully delivered to all functional UK T1/T2 sites            
Risk/Dep                     
History                     
8 3.4.8 (II-d) Streaming data management service. 01-Jan-06 Complete    
I
Metric   Deployment and testing of service. Contribute data for use in Physics TDR analysis.            
Risk/Dep                     
History                     
9 3.4.9 (II-e) Enhanced data management system planning 01-Jan-07 Complete I  
I
Metric  Requirements specification documents            
Risk/Dep                     
History                     
10 3.4.10 (II-f) Final data management system 31-Aug-07 Complete    
I
Metric  System delivered and accepted by CMS.            
Risk/Dep                     
History                     
11 3.4.11 (I-a) CMS job runtime environment system 01-Jan-06 Complete    
I See 07Q3 comments
Metric  Software release and associated documentation. Verification documentation            
Risk/Dep                     
History                     
12 3.4.12 (I-b) Job preparation and splitting system 01-Jan-06 Complete    
I
Metric  Software release and associated documentation. Verification documentation.            
Risk/Dep                     
History                     
13 3.4.13 (I-c) Job monitoring, tracking and bookkeeping system 01-Jul-06 Complete I  
I
Metric  Software release and associated documentation. At lesat 300 jobs submitted and tracked            
Risk/Dep                     
History                     
14 3.4.14 (I-d) Job output retrieval and publication 01-Jan-07 Complete I  
I
Metric  Software release and associated documentation. Sucessful retrieval and publication of 100 jobs            
Risk/Dep                     
History                     
15 3.4.15 (I-e) WLMS for CMS 31-Aug-07 Complete I  
I
Metric  Software release and associated documentation.             
Risk/Dep                     
History                     

[1]
Fill this in with code from Risk Register or use comments to note particular risks or dependencies
[2]
Links to ChangeForms if necessary
[3]
Fill this in with code from Risk Register or use comments to note particular risks or dependencies
[4]
Links to ChangeForms if necessary