Production Milestones
Link to WBS
Status Date
01-Apr-08
90
days
Owner:
Jeremy Coles
Number
Title
Due Date
Status
Links
More…
1
0.1
T1 participated in LCG service challenge 2
31/Mar/05
Complete
I
Metric
Particpate at a level that is consistent with other T1 centres worldwide
Risk/Dep
[1]
History
[2]
2
0.2
ID-5: T1 participated in LCG service challenge 3
01/Jul/05
Complete
I
I
Metric
Particpate at a level that is consistent with other T1 centres worldwide
Risk/Dep
[3]
History
[4]
3
0.3
T1 participated in service challenge 3 - service phase
01/Nov/05
Complete
I
I
Metric
Particpate at a level that is consistent with other T1 centres worldwide
Risk/Dep
History
4
0.4
T1 participated in LCG service challenge 4
03/Apr/06
Complete
I
I
Metric
Particpate at a level that is consistent with other T1 centres worldwide
Risk/Dep
History
5
0.5
T1 participated in LCG full model test
I
Metric
Tier-0/1/(2) full model test complete- All experiments (ALICE in proton mode)...
Risk/Dep
History
ChangeForm1
6
0.6
T1 participated in LCG service challenge 5
I
Metric
Particpate at a level that is consistent with other T1 centres worldwide
Risk/Dep
History
ChangeForm1
7
0.7
T1 participated in LCG full model test
I
Metric
[2006Q4] Deleted as no longer relevant. Experiments have new plans for 2007 which will be added into the schedule once they are agreed by the project.
Risk/Dep
History
ChangeForm1
8
0.8
At least one T2 participated in experiment service challenges
01/Nov/06
Complete
I
Metric
[2006Q4] Deleted as no longer relevant. Experiments have new plans for 2007 which will be added into the schedule once they are agreed by the project.
Risk/Dep
History
9
0.9
At least one T2 participated in LCG service challenge 5
I
Metric
Risk/Dep
History
ChangeForm1
10
0.10
All T2s participated in LCG full model tests
I
Metric
All four T2s participate.
Risk/Dep
History
ChangeForm1
11
0.11
T1-T2 data transfer tests completed
30/Sep/06
Complete
I
I
Metric
T1-T2 tests were defined and carried out successfully
Risk/Dep
History
Aligned with WLCG
12
0.12
All GridPP sites within LCG pass security audit
01/Sep/05
Complete
I
I
Metric
All tested sites pass the audit tests
Risk/Dep
History
13
0.13
Tier-1 - Tier-0 circuit established via UKLIGHT
01/Sep/05
Complete
I
I
Metric
Data can be transferred between T1 and T0 via UKLIGHT infrastructure
Risk/Dep
History
14
0.14
T1-T2 circuit estalished via UKLIGHT
01/Sep/05
Complete
I
I
Metric
Data can be transferred between T1 and specific T2s via UKLIGHT infrastructure
Risk/Dep
History
15
0.15
Tier-1 meets LCG bandwidth requirements
01/Nov/06
Complete
I
Metric
Physical bandwidth capability is sufficient to meet LCG requirements
Risk/Dep
History
16
0.16
Tier-2s meet LCG bandwidth requirements
01/Nov/06
Complete
I
Email from JC 2/10/07
Metric
Physical bandwidth capability is sufficient to meet LCG requirements
Risk/Dep
[5]
History
Email from JC 31/Jan/
07
[6]
17
0.17
Tier-1 is a full participant of LCG phase 1
01/Sep/04
Complete
I
I
Metric
Full commitment to LCG in place. Service running as part of LCG production grid....
Risk/Dep
[7]
History
[8]
18
0.18
Access to Tier-1A resources via grid interfaces only
15/Jan/08
Complete
I
Metric
All bulk activity on Tier-1A resources takes place via grid interfaces only....
Risk/Dep
History
ChangeForm1
19
0.19
Strategy in place to meet LCG disk, tape and CPU commitments
01/Jun/05
Complete
I
I
Metric
Document providing detailed strategy is approved by Tier-1 board
Risk/Dep
History
20
0.20
Tier-1 fully operational for LCG
I
Metric
(Les Robertson talk GDB October 2004). To be defined. 06Q4 - never was! Deleted.
Risk/Dep
History
ChangeForm1
21
0.21
Full T1 capacity available
01/Jul/07
Complete
I
Metric
Tier-1 providing all agreed resources for LHC startup
Risk/Dep
History
ChangeForm1
22
0.22
I
Metric
Risk/Dep
History
ChangeForm1
23
0.23
2005 Capacity plans available for RRB
31/Jan/05
Complete
I
I
Metric
Plans approved by PMB
Risk/Dep
History
24
0.24
2006 Capacity plans available for RRB
02/Jan/06
Complete
I
Metric
Plans approved by PMB
Risk/Dep
History
25
0.25
2007 Capacity plans available for RRB
01/Jan/07
Complete
I
Metric
Plans approved by PMB
Risk/Dep
History
26
0.26
Site Readiness Review Completed
01/Jul/07
Complete
I
Tier-1 review completed. Documented feedback is not public.
Metric
Site Readiness Review Completed
Risk/Dep
History
ChangeForm1
27
0.27
Production Grid continuity planning beyond GridPP2 completed
01/Jan/07
Complete
[9]
I
Metric
PMB agreed plan available to show evolution of the production service beyond GridPP2
Risk/Dep
History
28
0.28
Inventory of core services and associated service levels identified
In Progress
I
These four deliverables are wider than GridPP.
Metric
Inventory published
Risk/Dep
History
29
0.29
Procedures in place for adding new core services
In Progress
I
We monitor them but they are really done at the CIC/ROC/EGEE level
Metric
Procedures published
Risk/Dep
History
30
0.30
Tier-2s maintain core services for which they are responsible
In Progress
I
Metric
Monitoring in place: Monitored at a level approriate to the service
Risk/Dep
History
31
0.31
Procedures established to maintain core services
In Progress
I
Metric
Procedures published
Risk/Dep
[10]
History
[11]
32
0.32
Core service monitoring arrangements beyond EGEE-1 agreed
02/Feb/06
Complete
I
EGEE-II
Metric
Handover procedures documented and agreed by deployment team
Risk/Dep
[12]
History
[13]
33
0.33
Incident response procedures available and disseminated
28/Feb/05
Complete
I
I
Metric
Incident response procedures published on website and sites actively requested to review them
Risk/Dep
History
34
0.34
T1 complies with LCG/EGEE security policy
28/Feb/05
Complete
I
Metric
Statement from Tier-1 indicates all staff aware of policy and procedures
Risk/Dep
History
35
0.35
T2s comply with LCG/EGEE security policy
28/Feb/05
Complete
I
Metric
Statements from Tier-2 managers indicate all staff aware of policy and procedures
Risk/Dep
History
36
0.36
Tier-2 support posts filled
18/Mar/05
Complete
I
Metric
Posts filled
Risk/Dep
History
37
0.37
T1 full team in place
15/Mar/05
Complete
I
Metric
Full team working on Tier-1 deliverables
Risk/Dep
History
38
0.38
GridPP full deployment team in place
25/Apr/05
Complete
I
Metric
No gaps in deployment team coverage (allocated posts filled)
Risk/Dep
History
39
0.39
Tier-2 - GridPP MoUs signed by Tier-2s
01/Nov/04
Complete
I
I
Metric
Signed MoU
Risk/Dep
History
40
0.40
T2-T3 MoUs signed by sites
20/Jan/05
Complete
I
Metric
Signed MoUs
Risk/Dep
History
41
0.41
Completion of Phase-I service hardening
14/Dec/06
Complete
I
I
Metric
Execution plan available.
Risk/Dep
History
ChangeForm1
Re-aligned with WLC
G
42
0.42
Tier-1 met LCG service level requirements for 2005
02/Jan/06
Complete
I
Metric
No outstanding issues with level of service provided
Risk/Dep
History
43
0.43
Tier-1 met LCG service level requirements for 2006
01/Jan/07
Complete
I
Metric
No outstanding issues with level of service provided
Risk/Dep
History
44
0.44
Tier-1 met LCG service level requirements for 2007
31/Dec/07
Complete
I
SAM reliability test target met.
Metric
No outstanding issues with level of service provided
Risk/Dep
History
45
0.45
Tier-2s met LCG service level requirements for 2005
02/Jan/06
Complete
I
Metric
No outstanding issues with level of service provided
Risk/Dep
History
46
0.46
Tier-2s met LCG service level requirements for 2006
01/Jan/07
Complete
I
Metric
No outstanding issues with level of service provided
Risk/Dep
[14]
History
[15]
47
0.47
Tier-2s met LCG service level requirements for 2007
31/Dec/07
Complete
I
Sam tests OK
Metric
No outstanding issues with level of service provided
Risk/Dep
[16]
History
[17]
48
0.48
Tier-2 functionality verified by experiments
01/Feb/07
Complete
I
Email JC 2/10/07
Metric
Experiments/VOs have validated all required functionality is present at facility
Risk/Dep
History
49
0.49
Tier-2 storage accessible via SRM interface
31/Aug/05
Complete
I
Metric
SRM interface usable by experiments
Risk/Dep
History
Almost all sites an S
RM interface by end of 05Q4
50
0.50
Tier-1 storage accessible via SRM interface
15/Feb/05
Complete
I
Metric
SRM interface usable by experiments
Risk/Dep
History
51
0.51
Technology deployed to host Vos
15/Apr/05
Complete
I
Metric
RLS and VOMS/VO server available
Risk/Dep
History
52
0.52
GridPP able to support users in multiple Vos
01/Nov/05
Complete
I
Email fromJC 8/feb/06
Metric
Users with multiple VO membership are able to use GridPP resources under one account
Risk/Dep
History
53
0.53
Accounting package deployed and R-GMA configured at GridPP sites
15/Mar/05
Complete
I
Email fromJC 8/feb/06
Metric
GridPP accounting data being published by the Tier-1 and at least 90% of Tier-2 sites
90%
70%
Risk/Dep
History
54
0.54
GridPP accounting data accessible
01/Apr/05
Complete
I
Metric
GridPP accounting data viewable according to established requirements
Risk/Dep
History
05Q4- Condor now su
pported; SGE still in progress
55
0.55
GridPP able to monitor all supported sites
01/Jun/05
Complete
I
Metric
At least 90% of GridPP sites have deployed required monitoring software and configured it correctly.
Risk/Dep
History
56
0.56
GridPP able to monitor networks to all supported sites
01/Sep/05
In Progress
I
Metric
Tool available and deployed at supported sites
Risk/Dep
History
05Q4 - RT is rolling o
ut NetMon boxes over this period.
57
0.57
New Tape Robot Fully Commissioned
30-Jun-06
Complete
I
Metric
New tape robot is fully functional and commissioning regarded as complete
Risk/Dep
History
ChangeForm1
58
0.58
Test CASTOR Service Available for use in SC4
31-Jul-06
Complete
I
Metric
Castor service available for use in SC4
Risk/Dep
History
ChangeForm1
59
0.59
SC4 Phase-II participation
I
LCG cancelled
Metric
Tier-1 Successfully took part in Service Challenge 4 throughput phase II
Risk/Dep
History
ChangeForm1
60
0.60
SC3 Phase-II participation
31-Jan-06
Complete
I
Metric
Tier-1 Successfully took part in Service Challenge 3 throughput phase II
Risk/Dep
History
ChangeForm1
61
0.61
2006 Hardware Installation
15-Jul-06
Complete
I
Metric
Capacity CPU and Disk hardware upgrade available in production by 15 May 2005 (CPU) by 15 July 2005 (Disk).
Risk/Dep
History
ChangeForm1
62
0.62
Production Castor Service
30-Sep-06
Complete
I
Metric
Production CASTOR Service Available
Risk/Dep
History
ChangeForm1
63
0.63
Upgrade to SL4 complete
16-Jul-07
Complete
I
Metric
Upgrade to SL4 complete
Risk/Dep
History
ChangeForm1
64
0.64
FY06 Capacity upgrade to CPU farm available
01-Jan-07
Complete
I
Metric
Risk/Dep
History
65
0.65
FY06 Capacity upgrade to DISK farm available
01-Apr-07
Complete
I
Metric
Risk/Dep
History
66
0.66
Connection to SJ5 at 10Gb/s
01-Jan-07
Complete
I
This is delayed by RAL networking group; Subject of many weekly Tier-1 reports; Expect completion very soon
Metric
Risk/Dep
History
67
0.67
On-call system in place forTier-1
01-Apr-08
Complete
I
Delayed because manpower went into CASTOR problem. Need to re-schedule
Metric
Risk/Dep
History
ChangeForm1
ChangeForm1
68
0.68
Production 3D service available
01-Oct-06
Complete
I
Metric
Risk/Dep
History
69
0.69
I
Metric
WLCG milestone IS-1
Risk/Dep
History
[1]
Fill this in with code from Risk Register or use comments to note particular risks or dependencies
[2]
Links to ChangeForms if necessary
[3]
Fill this in with code from Risk Register or use comments to note particular risks or dependencies
[4]
Links to ChangeForms if necessary
[5]
Fill this in with code from Risk Register or use comments to note particular risks or dependencies
[6]
Links to ChangeForms if necessary
[7]
Fill this in with code from Risk Register or use comments to note particular risks or dependencies
[8]
Links to ChangeForms if necessary
[9]
David Britton:
GridPP2+ and GridPP3 defined
[10]
Fill this in with code from Risk Register or use comments to note particular risks or dependencies
[11]
Links to ChangeForms if necessary
[12]
Fill this in with code from Risk Register or use comments to note particular risks or dependencies
[13]
Links to ChangeForms if necessary
[14]
Fill this in with code from Risk Register or use comments to note particular risks or dependencies
[15]
Links to ChangeForms if necessary
[16]
Fill this in with code from Risk Register or use comments to note partic