Errata to the GridPP Proposal
Proposal Document
page 4. "thesel" -> "these".page 5. The phrase "including the network development" referring to Section 5 should refer to Section 4.
Page 10 Figure 2 caption. "number of element" -> "number of elements".
Page 11. "will of prepare" -> "will prepare".
Page 13 Table 1. Delete spurious 10th line "95% success".
Page 16. "emphasis" -> "emphasise".
Page 19 Table 2. The total CPU requirements listed as
"CPU [kSI2000] 4399 6071 8386 11972" should read
"CPU [kSI2000] 2395 4066 6380 9965".
(The graph in Figure 8 on page 17 is correct).
Page 27 Last sentence. "and show separately" should be "are shown separately".
Page 29 Table 13. The total CPU requirements listed as
"Requirement 4399 6071 8386 11972" should read
"Requirement 2395 4066 6380 9965".
Page 29 "is anticipated at the Tier-1 centre." should be "is anticipated at the Tier centres." in relation to Table 14.
Page 29 Table 15. The caption including reference to "Tier-1 centres" should be to "Tier centres" (as in Tables 13 and 14).
An updated version of the document incorporating the above changes can be found here.
Planning Documents
Travel Planning Document
Page 2 Budget Profile. The total should be £1062 not £872. The numbers in column 2 of Table 1 should be £160, £363, £377, £162, £1062. This is because the travel budget was increased to support people working on GridPP but paid for from other sources (e.g. CLRC, Institutes).
Last modified Wed 26 November 2003 . View page history